Question: Industrial Engineering Figure 1 shows the process flow for production of car assembly at ELECTRON Holdings Bhd. The company operates at 24/7 a week in

Industrial Engineering Industrial Engineering Figure 1 shows the process flow for production of car

Figure 1 shows the process flow for production of car assembly at ELECTRON Holdings Bhd. The company operates at 24/7 a week in two shif mode. The machines will be non-stopped running even during the break time. (a) Determine the standard rate or capacity per hour for the production of car assembly. (b) Justify your answer. (2 marks) (e) Calculate the Deaign Capacity for one day production. (2 marks) (d) Determine the expected output for this week if the actual production is 280 unit last week and Effective Capacity, 53 unit per day. (6 markss) (e) Suggest one method how the expected output in (c) can be increased. (5marks) Figure 1: The Car Assembly Process

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!