Question: industrial system simulation : Solve the schedule below: Resource:1-2-3-4 Queue:1-2-3-4 Problem 2: A production system consists of four serial automatic workstations. The first part arrives
industrial system simulation :
Problem 2: A production system consists of four serial automatic workstations. The first part arrives at time zero, and then (exactly) every 9.8 minutes thereafter. All transfer times are assumed to be zero and all processing times are constant. There are two types of failures: major and jams. The data for this system is given in the table (all times are in minutes). Use exponential distributions for the uptimes and uniform distributions for repair times. Run your simulation for a single replication of 10,000 minutes. Workstation Number Process Time Jam Means Uptimes Repair 1 2 Major Failure Means Uptimes Repair 475 20.30 570 24. 36 665 28.42 475 20, 30 8.5 83 8.6 8.6 47.6 57 66.5 47.5 2.3 2.4.3.6 2.8. 4.2 2.3 Dr. Mohammed Salem Spring 2022 % of time the Resource spends in the failure state Recourse 1 2 3 4 Number Waiting at the end of simulation (Parts) Queue 1 2 3 4 Solve the schedule below:
Resource:1-2-3-4
Queue:1-2-3-4
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
