Question: Input Information: Maintenance Hole 1 Elevation: 1 9 6 . 0 5 m Maintenance Hole 2 Elevation: 1 9 7 . 2 1 m Sewer
Input Information:
Maintenance Hole Elevation: m
Maintenance Hole Elevation:
Sewer Length:
Tributary Area: ha
Runoff Coefficient:
Inlet Time: minutes
Intensity Duration Frequency IDF Parameters:
Year Storm: a: ; b: ; c:
Minimum Sewer Diameter:
Sewer Wall Thickness: D
Full Flow Velocity: minimum : maximum
Minimum Sewer Cover:
Mannings Roughness Coefficient:
Nominal Storm Sewer Sizes: etc.
Design:
Calculate time of flow
to upper end
in section
Step by Step Solution
There are 3 Steps involved in it