Question: Instructions: Edit the following sentences for comma errors. Some commas are missing. Other commas need to be deleted or replaced with other punctuation. 1. The

Instructions: Edit the following sentences for
Instructions: Edit the following sentences for
Instructions: Edit the following sentences for comma errors. Some commas are missing. Other commas need to be deleted or replaced with other punctuation. 1. The rail industry does not have a standard to rate the condition of bridges or determine a state of maintenance, however there is a standard in place for highway bridges. 2. Since one or more of the lines of the subject parcels do not appear on atract map, official map, or previous record of survey we must file a Record of Survey with the county in order to establish any point or line in the boundary lines as required by state law. 3. A high score on the Pugh Matrix will be given to the design that incorporates timber as the main structural component and a low score will be given to a design that incorporates mainly steel or concrete 4. Grassed swales slow the stormwater flow velocity which encourages the settlement of particulate matter 5. As shown in Figure 1 the facility consists of two, large above ground storage tanks, and three associated structures 6. The existing two-lane 60-foot three-span timber structure was built in the late 1950s. 7. Pipe piles, if selected should be equipped with inside-fitting cutting shoes to reduce the risk of tip damage and facilitate penetration into the gravel. Similarly H-pile sections, if selected should be fitted with driving tips. 8. This project was conducted by modeling a tieback retaining wall, and analyzing the data collected 9. Dear Mr. Amari; Please find attached to this cover letter the required 3 sets of the temporary shoring design... 10. OrganizationNamel's highest priority is owner and user satisfaction, we therefore implement a measurement and verification plan to ensure systems are functioning at a satisfactory level. 11. The advantages to this alternative are, reduced construction cost, avoidance of impacts to the existing combined sewer inlets and reduction of impacts to the approach roadway. 12. On April 16 2014 Good Business, Inc. conducted a DPE pilot test on five DPE test wells

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!