Question: Interpreting Process Capability Results In this week's final assignment, you're asked to interpret the results from a process capability study using the results provided. Cable

Interpreting Process Capability Results In this week's final assignment, you're asked to interpret the results from a process capability study using the results provided. Cable wire diameter data An engineer at a metals company wants to determine whether the diameter of a cable wire that the company manufactures meets specifications. Each hour, operators take a subgroup of five consecutive cable wires from the production line and measure the diameters. A cable wire must be 0.55 + 0.05 cm in diameter to meet engineering specifications. Process Capability Report for Diameter LSL USL Process Data Overall LSL 0.5 Within Target USL 0.6 Overall Capability Sample Mean 0.545615 Pp 0.87 Sample N 96 PPL 0.79 StDev(Overall) 0.0191478 PPU 0.95 StDev(Within) 0.0182995 Ppk 0.79 Cpm * Potential (Within) Capability Cp 0.91 CPL 0.83 CPU 0.99 Cpk 0.83 0.50 0.52 0.54 0.56 0.58 0.60 Performance Observed Expected Overall Expected Within PPM USL 10416.67 2253.62 1479.51 PPM Total 20833.33 10857.63 7818.86

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Mathematics Questions!