Question: Is the average time to complete an obstacle course different when a patch is placed over the right eye than when a patch is placed

 Is the average time to complete an obstacle course different when

Is the average time to complete an obstacle course different when a patch is placed over the right eye than when a patch is placed over the left eye? Eight randomly selected volunteers first completed an obstacle course with a patch over one eye and then completed an equally difficult obstacle course with a patch over the other eye. The completion times are shown below. "Left\" means the patch was placed over the left eye and "Right\" means the patch was placed over the right eye. Time to Complete the Course R [ 45 [ 8 [0 [15 1 [ [0 Ler 16 46 [0 [37 59 [ [ [0 Assume a Normal distribution. What can be concluded at the the = 0.05 level of significance

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Mathematics Questions!