Question: Is this project scope statement missing any additional steps or is there room for improvement? I'm limited to certain pages for this assignment and wonder
Is this project scope statement missing any additional steps or is there room for improvement? I'm limited to certain pages for this assignment and wonder if I'm leaving something out that's important. First will be the scope statement that I'm working on and the other is the project charter that I'm making the scope out of. Project Charter Project Objective
The objective of this project is to modernize three 20-seat computer labs at a university and equip them with state-of-the-art PCs and smart TVs, as well as a secure environment where students can foster collaborative learning. The labs will adhere to the university's cybersecurity standards and provide a user-friendly environment.
Scope Description
The project involves the following key deliverables and requirements:
- Design layout
- Identify and obtain the type of computers needed and smart TVs
- Choose appropriate seating arrangements
- Create floor plans that facilitate efficient space usage
- Physical set up
- Connect the mouse, monitor, and monitor to the PC
- Install network cables
- Set up smart TVs in their designated space
- Connect all hardware to the network
- Network set up
- Install and configure router
- Configure the router to connect with the university's active directory (AD)
- Enable secure connection for smart TVs and PCs
- Test network connection for stability and speed
- Digital Security
- Implement security measures (firewall, anti-virus, and session timeouts)
- Configure active directory
- Establish a logging and monitoring system
- Physical security
- Installation of card-based access to the lab
- Physical lock installation for computers
- Security camera installation for the labs
- Testing and Support
- Testing of all devices, including PCs, smart TVs, and network infrastructure
- Conduct a security audit to ensure compliance with cybersecurity guidelines
Exclusions
- No upgrades to the university's network infrastructure beyond the lab boundaries
- Procurement of software licenses is not covered in the agreement
Constraints
- Strict adherence to the university's budget and timeline
- Completion of the project before the start of the next term
- Compliance with the university's IT standards and guidelines
Assumptions
- Timely procurement of all hardware and software
- Full cooperation from the university's IT department for AD integration and testing
- End-users will comply with security and usage guidelines
Acceptance Criteria
- All PCs, TVs, and network criteria are installed and operational
- Authentication through the university's AD is functional and secure
- Digital and physical security measures are tested and verified
- Training is conducted, and support documentation is given to lab staff.
Project Charter: Desktop Lab Project
Project title
Desktop Lab Retrofit and Security Enhancement
Purpose
The purpose of this project is to modernize three twenty-seat computer labs at a university and equip them with updated PC and Smart TVs; these updates are to improve collaboration and the learning environment; the project will ensure that the labs are secure and that the labs comply with the university's cybersecurity guidelines and provide a secure, user-friendly environment
Description
The project will focus on upgrading three computer labs; each will be equipped with 20 desktop PC and three smart TVs; these upgrades aim to foster collaborative learning and improve the educational experience by:
- Ensuring PCs are configured to comply with the university's security protocols, which include
- Authentication through active directory
- Session timeouts for inactive users
- Protection from malware and keyloggers
- Continuous updates and threat monitoring
- Scope Statement
The project will include the following activities:
- Installation of 20 Desktops and three smarts Tv's in each of the three labs
- Configuration of the PC so that users can be authenticated through the university's directory
- Implementation of session timeouts due to idle time and security measures to prevent the installation of malware
- Regular updates to maintain security
- Establish recommendations for physical security measures for the lab
Out of Scope:
- The project does not include any post-project maintenance and ongoing technical support
Objectives
- Successfully retrofit the three labs with the required desktops and smart Tv's
- Configure the desktops to meet university security measures
- Implement both physical and digital security measures in the lab
- Complete the project on time and budget
Success Criteria
- All labs are fully functional and secure by the project deadline
- Students can authenticate themselves on the university's site and use the PC in compliance with the university's guidelines
- Malware protection is fully operational, and no unauthorized software is installed
- Physical security measures are in place, including controlled access and surveillance
- The project is complete within budget and timeline
- Deliverables
Retrofitted lab
- 20 Desktop PCs and 3 Smart TVs per lab
- All PCs are configured for active authentication and session management
Security Measures
- Protection against malware
- Continuous updates for the PCs and connected devices
- Logging and Monitoring systems are installed
Physical security recommendation
- Surveillance cameras installed in labs
- Card-based access system for the labs
Acceptance Criteria
- Retrofitted Lab
- PC meets authentication requirements and security protocols
- Smart TVs are set up and connected to the network
- Security Measures
- No unauthorized software can be installed
- Security updates and threat monitoring are active and functional
- Physical Security
- Install locks on all computer cabinets and equipment
- Use card-based access to restrict entry to the labs
Milestone Schedule
| Milestone | Targeted Date |
| Project Kick off | January 15, 2025 |
| Equipment Procurement | January 30, 2025 |
| Installation of PC and Tv | February 15, 2025 |
| Configuration of Security System | February 28, 2025 |
| Physical security measures finalized | March 5, 2025 |
| Final Testing and User Acceptance | March 10, 2025 |
| Closeout | March 15, 2025 |
Key Assumptions
- All equipment will be available for timely procurement
- The university's IT department will support active directory and configurations
- Fundings for physical security improvements will be sufficient
Constraints
- The project must be completed within budget and timeline
- The security measures must comply with the university's guidelines
- Physical security measures must be cost-effective
Risks
- Delays in equipment procurement: Identify alternative suppliers in case of shipping delays occur
- Compatibility Issues: conduct a preliminary combability test before implementation
- Security Breaches: perform regular vulnerability assessments during and after the project
- Budget Overruns: monitor expenses closely and maintain contingency fund
- Labor Availability: partner with external IT vendors to provide backup support if needed
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
