Question: It is planned to drill a well by using oil-based mud. During the drilling operation, the adsorption (osmotic) pressure of 11950 psi is estimated to

It is planned to drill a well by using oil-based mud. During the drilling operation, the adsorption (osmotic) pressure of 11950 psi is estimated to provide the stability of a shale zone whose temperature of 45C according to the data obtained from the offset wells existing wellbores that may be used as a guide for planning a well (Assume that the freshwater is used in the preparation of the oil-based mud).

a) Calculate the activity of the shale.

b)If the amount of CaCl2 salt (in lbm) that should be added to 1 bbl of water is 176.3 lbm/bbl, calculate the CaCl2 salinity (in percent by weight) of the water phase in the drilling fluid required to balance the activity of the shale zone.

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Chemical Engineering Questions!