Question: Jobs A, B, and C require processing at work centre 1 then work centre 2, with the processing times at each work centre shown below.

Jobs A, B, and C require processing at work centre 1 then work centre 2, with the processing times at each work centre shown below. What is the job sequence using Johnson's rule?

Jobs A, B, and C require processing at work centre 1 then

Multiple Choice A,C,B C,B,A B,C,A B,A,C