Question: Jobs A, B, and C require processing at work centre 1 then work centre 2, with the processing times at each work centre shown below.


Jobs A, B, and C require processing at work centre 1 then work centre 2, with the processing times at each work centre shown below. What is the job sequence using Johnson's rule? J 0b WC#1 WC#2 A 3 7 B 6 4 C 5 8