JR and Mike are preparing to revise their project management textbook. The project of revising the book begins with developing a revision plan. Developing a revision plan includes four activities that each take one week to complete. First, both JR and Mike go over the reviews provided by a sample of current adopters of the book. The second task involves Mike benchmarking other project management books. Benchmarking other books can either be done in parallel with going over the reviews or done after the reviews have been studied. After both the reviews have been gone over and the benchmarking is completed, JR and Mike decide on the changes to make to the book. The final step in developing the plan is JR allocating the work between himself and Mike. The work can be allocated once the authors finalize the changes. After the plan has been developed, JR and Mike revise the book, which is expected to take 24 weeks. Once all the chapters have been revised, JR and Mike review the page proofs, which is expected to take 8 weeks. After the page proofs have been reviewed, Mike works on creating an index for the book, which takes 2 weeks. Finally, after the book has been revised, JR updates the supplements that accompany the book, which takes 8 weeks. Update the information previously entered in Microsoft Project with the resource information provided here. Assume the project begins on March 7, 2016, and the estimated times for the tasks are based on the authors working full time on this project. After entering the resource information, are there any problems with the resources being overallocated? If so, level the resource load so that the resources are not overloaded. What impact does leveling the resources have on the expected project completion time? Do Problem with the following clarifications In the description of the book project, it is not clear if preparing the supplemental materials can begin after JR and Mike finish the revisions (the 24-week task) or after Mike creates the index. Assume it is the former. Enter all the information in Project. Paste the Entry table into your submission. Paste Gantt chart after leveling into your submission. JR and Mike are preparing to revise their project management textbook. The project of revising the book begins with developing a revision plan. Developing a revision plan includes four activities that each take one week to complete. First, both JR and Mike go over the reviews provided by a sample of current adopters of the book. The second task involves Mike benchmarking other project management books. Benchmarking other books can either be done in parallel with going over the reviews or done after the reviews have been studied. After both the reviews have been gone over and the benchmarking is completed, JR and Mike decide on the changes to make to the book. The final step in developing the plan is JR allocating the work between himself and Mike. The work can be allocated once the authors finalize the changes. After the plan has been developed, JR and Mike revise the book, which is expected to take 24 weeks. Once all the chapters have been revised, JR and Mike review the page proofs, which is expected to take 8 weeks. After the page proofs have been reviewed, Mike works on creating an index for the book, which takes 2 weeks. Finally, after the book has been revised, JR updates the supplements that accompany the book, which takes 8 weeks. Update the information previously entered in Microsoft Project with the resource information provided here. Assume the project begins on March 7, 2016, and the estimated times for the tasks are based on the authors working full time on this project. After entering the resource information, are there any problems with the resources being overallocated? If so, level the resource load so that the resources are not overloaded. What impact does leveling the resources have on the expected project completion time? Do Problem with the following clarifications In the description of the book project, it is not clear if preparing the supplemental materials can begin after JR and Mike finish the revisions (the 24-week task) or after Mike creates the index. Assume it is the former. Enter all the information in Project. Paste the Entry table into your submission. Paste Gantt chart after leveling into your submission.
Expert Answer:
Answer rating: 100% (QA)
a Project Deliverable Project deliverable can be defined as the quantifiable products or services wh... View the full answer
Related Book For
OM4 operations management
ISBN: 978-1133372424
4th edition
Authors: David Alan Collier, James R. Evans
Posted Date:
Students also viewed these general management questions
-
Review and revise your Financial Plan as necessary once you determine your retirement needs, answer the following questions: What have you learned from completing your retirement calculations? Are...
-
A first step in regression analysis often involves developing a scatter plot of the data. Develop the scatter plots of all the possible pairs of variables, and with a brief statement indicate what...
-
Complete question 4 in your textbook on page 578 (Chapter 23). Create your table in Word as shown on page 578 for this question. Provide your findings in the space provided. Your response should be...
-
pthyon Carleton student ID). Add a function named find_diff() to your program that takes a 2-D list of any size containing some positive integers. Your function must find the difference between the...
-
Use the values in the cross-tabulation table to solve the equations given. a. P(A D) = ______ b. P(E B) = ______ c. P(D E) = ______ d. P(C F) =______ D EF A 5812 B|10|614 C825
-
For the following problems, unless stated otherwise, you may assume that the cost of land, L, and the salvage value, S, of the plant are both zero. In reviewing current operating processes, the...
-
Consider laminar boundary layer flow over a flat plate. For identical flow conditions, determine the entries not shown in the table below, using the fact that \(\delta / \delta_{t}=P r^{n}\). The...
-
1. What marketing data would you want to have available to make the decision? 2. What cost data would you need to make a rational decision? 3. What are some of the logistics supply chain issues that...
-
If you worked for one of the oil companies and were tasked to negotiate an oil contract with the Nigerian government, how would you go about it? What would you recommend your company do? Why?
-
The shareholders of X Ltd. will vote at the forthcoming annual meeting on a proposal to establish a bonus plan for X Ltd. management, based on firm earnings. Proponents of the plan argue that...
-
Each project is unique, and each project methodology is used according to the needs of the project. Planning details are in proportion to what you want to achieve, the costs involved, and the...
-
Ellas Bakery plans to purchase a new oven for its store.The oven has an estimated useful life of 4 years. The estimated pretax cash flows for the oven are as shown in the table that follows, with no...
-
Consider a cone at a very high angle of attack to the flow, high enough so that the shock wave is detached from the cone vertex. Lay out in detail a plan of attack for solving this flow field.
-
In addition to the variables in problem 3 above, assume the existence of the following variable and answer the following questions: Data From Exercise 3 Given the following variables, give the result...
-
Johnnie International Company sold 200 boxes of Whiskey bottles, amounting to 8,500, to Party King Pub by accepting a 60-day, 10% note dated May 1, 2022. Make the entry necessary on May 1 for Johnnie...
-
Provide an example of an operating cash inflow that could result from sustainability activities. Also provide an example of an operating cash outflow that would support sustainability.
-
The section on Community Impacts of my project should address the following topics (check all that apply): Group of answer choices Changes in community composition Direct impacts of management...
-
The figure shows a bolted lap joint that uses SAE grade 8 bolts. The members are made of cold-drawn AISI 1040 steel. Find the safe tensile shear load F that can be applied to this connection if the...
-
Trucks using a single-server loading dock have a mean arrival rate of 14 per day. The loading/unloading rate is 19 per day. a. What is the probability that the truck dock will be idle? b. What is the...
-
A university currently has a recycling program for paper waste. The fixed cost of running this program is $8,000 per year. The variable cost for picking up and disposing of each ton of recyclable...
-
The R&D manager of the Beck Company is trying to decide whether or not to fund a project to develop a new lubricant. It is assumed that the project will be a major technical success, a minor...
-
Using the potential theory obtain the damping for a cycle of (i) plunge, (ii) pitch oscillations.
-
Consider a delta wing with sweep angle \(\Lambda\). Show that the expressions 8.11 and 8.12 give the same lift line slope for the delta wing. Eq 8.11 Eq 8.12 = CD CD+CL tan
-
Using the Polhamus theory obtain the drag polar for a delta wing with sweep angle \(75^{\circ}\).
Study smarter with the SolutionInn App