Question: JT Engineering is considering two new projects. After using the NPV method to determine the acceptability of the projects, Project A comes back with an
JT Engineering is considering two new projects. After using the NPV method to determine the acceptability of the projects, Project A comes back with an NPV of $5,200 and Project B comes back with an NPV of $0. Based on this information, which of the following correctly describes the acceptability of these projects?
- Both projects are acceptable, however Project A is more attractive
- Project B is acceptable, and Project A is unacceptable
- Both projects are acceptable, and Project B is more attractive
- Project A is acceptable and Project B is unacceptable
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
