Question: Just need help with the last section. The empty boxes. Each Triam Deluxe gamer computer system consists of two speakers, a monitor, a system unit,
Just need help with the last section. The empty boxes.



Each Triam Deluxe gamer computer system consists of two speakers, a monitor, a system unit, a keyboard, and an installation kit. These pieces are packed together and shipped as a complete kit. In MRP terms, all of these items are level 1 items that make the level O kits. Complete the MRP records, using the following information: Production plans for complete kits are as follows: Start assembling 8,500 kits in week 2 Start assembling 19,000 kits in weeks 3, 4, and 5 Start assembling 4,500 kits in week 6 The gross requirements for the system unit have already been given to you. For the remaining items, you will need to figure out the gross requirements. All scheduled receipts, lead times, and beginning inventory levels are shown. :: Click the icon to view the MRP records. Construct the material requirements plan for item System unit (enter your responses as whole numbers). Enter your answer in the edit fields and then click Check Answer. ? 4 5 Construct the material requirements plan for item System unit (enter your responses as whole numbers). System unit: Lead Time = 1 week; Minimum order quantity = 13,000 Week 2 3 6 Gross requirements 8,500 19,000 19,000 19,000 4,500 Scheduled receipts Projected ending inventory: 5,500 5500 10000 4000 0 0 8500 Net requirements 0 3000 9000 15000 19000 4500 Planned receipts 0 13000 13000 15000 19000 13000 Planned orders 13,000 13,000 15,000 19000 13,000 0 6 9000 Construct the material requirements plan for item Speakers (enter your responses as whole numbers). Speakers: Lead Time = 2 weeks; Minimum order quantity = 14,000 Week 1 2 3 4 5 Gross requirements 0 17000 38000 38000 38000 Scheduled receipts 16,500 Projected ending inventory: 18,500 35000 18000 0 0 0 Net requirements 0 0 20000 38000 38000 Planned receipts 0 0 20000 38000 38000 Planned orders 20,000 38,000 38,000 14,000 0 5000 9000 14000 0 Construct the material requirements plan for item CD-ROM drivers (enter your responses as whole numbers). CD-ROM drivers: Lead Time = 1 week; Minimum order quantity = 16,000 Enter your answer in the edit fields and then click Check Answer. 6 9000 Construct the material requirements plan for item Speakers (enter your responses as whole numbers). Speakers: Lead Time = 2 weeks; Minimum order quantity = 14,000 Week 1 2 4 5 Gross requirements 0 17000 38000 38000 38000 Scheduled receipts 16,500 Projected ending inventory: 18,500 35000 18000 0 0 0 Net requirements 0 0 20000 38000 38000 Planned receipts 0 0 20000 38000 38000 Planned orders 20,000 38,000 38,000 14,000 5000 9000 14000 0 1 4 6 5 19000 4500 Construct the material requirements plan for item CD-ROM drivers (enter your responses as whole numbers). CD-ROM drivers: Lead Time = 1 week; Minimum order quantity = 16,000 Week 2 3 Gross requirements 0 8500 19000 19000 Scheduled receipts Projected ending inventory: 8,000 Net requirements Planned receipts Enter your answer in the edit fields and then click Check