Question: Kindly help design a Gantt chart and critical path network based on the info below: This is for a home construction project plan WBS Item
Kindly help design a Gantt chart and critical path network based on the info below:
This is for a home construction project plan

WBS Item Dependencies Durations 7) Project Gantt (Bar Chart) Schedule: Using 1.1 Landscape the information supplied in the Dream House 1.1.1 Task A 2 Task Table, create a Gantt chart showing the 1.1.2 Task B 1.1.1 IN 6 project schedule. 1.1.3 Task C 1.1.2 1.2 House Structure You do not need to use any professional 1.2.1 Task D 1.1.1 5 1.2.2 Task E 1.3.2 8 scheduling software; if necessary, a 1.2.3 Task F 1.3.2 digital image of a hand-drawn Gantt 1.3 Inside Work chart will be acceptable. 1.3.1 Task G 1.1.1 4 1.3.2 Task H 1.1.3, 1.6.1 8) Critical Path (Network) Diagram: Prepare a 1.3.3 Task I 1.2.2, 1.2.3, 1.4.3, 1.5.3 2 full network diagram (using the critical path method that includes both the forward and 1.4 Infastructure backward pass information) for the project. 1.4.1 Task J 1.6.1 1.4.2 Task K 1.3.2, 1.4.1, 1.5.1 w 1.4.3 Task L 1.4.2, 1.5.2 3 You do not need to use any professional 1.5 Management scheduling software; any drawing 1.5.1 Task M 1.6.1 4 package, Excel or, if necessary, even a 1.5.2 Task N 1.5.1 N digital image of a hand-drawn network 1.5.3 Task O 1.5.2 4 diagram will be acceptable. 1.6 Other 1.6.1 Inspection 1.1.2, 1.2.1, 1.3.1 2 1.6.2 Milestone #1 1.4.2 o O 1.6.3 Milestone #2 1.2.2, 1.3.3, 1.4.3 Project schedule data
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
