Question: lCode structure X.X.X.X l0 Office Building Project 1.0 Project Management Documents 2.0 Design Documents 3.0 Procured Materials 4.0 Constructed Building Further deconstruct each subdivision l1.1.1

lCode structure X.X.X.X
l0 Office Building Project
1.0 Project Management Documents
2.0 Design Documents
3.0 Procured Materials
4.0 Constructed Building
Further deconstruct each subdivision
l1.1.1 Design Management
l1.1.2 Construction Mgt.
l1.1.3 Proj. Mgt. and Ctl.
l1.2.1 Design Overview
l1.2.2 Civil Design
l1.2.3 Electrical Design
l1.2.4 Mechanical Design
l1.2.5 Structural Design
l1.2.6 Arch. Design
l1.2.7 Plumbing Design
l1.3.1 Subcontracting
l1.3.2 Bulk Material
l1.3.4 Const. Support
l1.3.5 Training and Doc.
l1.4.1 Prepared Site
l1.4.1.1 Site Mobilization
l1.4.1.2 Site Preparation
l1.4.1.3 Site Flat Work
l1.4.1.4 Landscaping
1.4.2 Structure
l1.4.3 Electrical Work
l1.4.4 MEP Systems
l1.4.4.1 HVAC
l1.4.4.2 Mech. System
l1.4.4.3 Plumbing
l1.4.5 Finishes
l1.4.5.1 Exterior Curtain Wall
l1.4.5.2 Interior Walls and Ceilings, Doors.
l1.4.5.3 Interior Finishes
l1.4.5.4 Interior Fixtures, Kitchen, Cabinets, etc.
Please recreate the WBS provided in slides 65-67 in session 1 such that it meets the requirements for DWBS. Please do not add any new deliverables but please modify the rest including the structure, numbering, and terms used to define the deliverables such that they meet the guidelines discussed in the class. Provide the DWBS as an indented list starting from the project at the top level