Question: ( lecture 8 ) Please consider section 8 . 2 Project Selection of lecture note. ( a ) If one of projects 1 or 5

(lecture 8) Please consider section 8.2 Project Selection of lecture note.
(a) If one of projects 1 or 5 must be done at most, what is the new constraint?
(b) If project 3 is chosen only if project 2 is chosen, what is the new constraint?
(c) If at least two of projects 1,2 or 4 must be done, what is the new constraint?
(d) If projects 1 and 4 are mutually exclusive ?1, what is the new constraint ?2?
(e) If projects 2,3, and 5 are mutually exclusive, what is the new constraint?
(lecture 8) Please consider section 8.3 Selection of Sites of lecture note. If the response time is within 8 minutes, what are the new constraints for each tract?
(lecture 8)(problem 12.5-2 for the 11th edition, problem 12.5-3 for the 10th edition) Maximize Z=200x1+80x2
(c) Please solve the problem by brute force, that is, compute the objective function value for each feasible solution and compare with the result in problem (b).
(lecture 9) Please consider the example in Section 9.1 Branch-and-Bound Method of lecture note.
(a) After the first iteration, why do we consider the branch with x1=1?
(b) For the third iteration, why do we dismiss the branch with x3=1?
(c) For the forth iteration, path of the problem (b), which constraints are violated with x4=1 for the original problem?
Please help me with my operations research homework please make sure calculations are clear less of explanations if not needed and if it involves drawing show the drawing too

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!