Question: linear scheduling method 32. Draw a precedence network for three activities: A,B, and C; with durations of 9,4 , and 7 days, respectively, and connected
32. Draw a precedence network for three activities: A,B, and C; with durations of 9,4 , and 7 days, respectively, and connected with Start-to-Start (SS) and Finish-to-finish (FF) relationships. Put a 2-day lag on every SS relationship and a 1-day lag on every FF relationship. All activities are contiguous and noninterruptible. Interruptible activity: an activity that can be performed in two or more separate segments. It is an activity that can be interrupted or paused. Contimous activity: an activity that cannot be split or paused. Once work starts on a continuous activity, it has to continue until its completion. Use the Activity Node Key, apply the Critical Path Method calculations by (1) drawing the network diagram, (2) conducting forward pass and backward pass analysis, and (3) computing total float of all activities. (See next page for Ouestion 33)
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts