Question: LT - 9 . A static load test has been conducted on a 6 0 - ft . long, 1 6 - inch square precast

LT-9. A static load test has been conducted on a 60-ft. long, 16-inch square precast concrete
pile that was driven from a barge through 20ft. of water, then 31ft. into the underlying soil.
Telltale rods A and B were embedded at points 30ft. and 59ft. from the top of the pile,
respectively. The data recorded at pile load failure was as follows:
Load at head of pile =139,220lbs.
Settlement at head of pile =1.211 in.
Settlement of Telltale Rod A=1.166 in.
Settlement of Telltale Rod B =1.141 in.
Use the data from Telltale rod A to compute the modulus of elasticity of the concrete.
Now, use this modulus value to compute the tip bearing capacity and the side friction values
in the soil. Assume no friction exists between the Telltale Rod A embedment point and the ground
surface, so the load in the pile at depth 30ft. is essentially the same as that applied to the top of the
pile.
LT - 9 . A static load test has been conducted on

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!