Question: Machines in a factory break down at an average rate of 3 per day. When a machine breaks down, it enters a queue to be

Machines in a factory break down at an average rate of 3 per day. When a machine breaks down, it enters a queue to be repaired. There is a single repairperson on duty, who repairs machines at an average rate of 5 per day. Assume that the process of machines breaking down and being repaired can be modelled as an M/M/1 queue with an arrival rate of =3 per day and a service rate of =5 per day. Although the factory is only open for 8 hours per day, the state of the system at the beginning of any particular day is the same as the state at the end of the previous day, so that the system effectively evolves in a continuous, uninterrupted way over time.

(f) State two standard assumptions of an M/G/1 queue and comment on whether these are likely to be realistic for the system considered in this question.

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!