Question: Make a logical network diagram 1 Notice to Proceed (NTP) - Owner's approval to begin construction. Milestone: 0 days; No Resources. Predecessors: None. 2 Award
Make a logical network diagram 1 Notice to Proceed (NTP) - Owner's approval to begin construction. Milestone: 0 days; No Resources. Predecessors: None. 2 Award Subcontracts (AWARD SUBS) - Award subcontracts to selected subcontractors. Duration: 3 days; No Resources, Predecessors: 1 3 Procure Plywood Web Joist (PROC JST) - Procurement of web plywood joists. Duration: 10 days; No Resources. Predecessors: 2 Procure AC Unit (PROC ACU) - Procurement of air conditioning unit. Duration: 10 days; No Resources. Predecessors: 2 5 Procure Furnace (PROC FURN) - Procurement of furnace unit. Duration: 8 days; No Resources. Predecessors: 2 6 Clear Site (CLR SITE) - Includes the demolition of a small structure, removal of debris and rough grading of the site. Duration: 2 days; 3 Resources. Predecessors: 2 Foundations (FDNS) - Construction of the foundations for the new building. Duration: 3 days; 3 Resources. Predecessors: 6 8 Underground Services (U/G SERV) - Installation of the water and sewer services under the structure from the mains in the street. Duration: 1 day; 2 Resources, Predecessors: TBD 9 Exterior Walls (EXT WALL) - Construction of the exterior block walls including hollow metal doorframe installation. Duration: 7 days; 6 Resources, Predecessors: TBD 10 Roof Deck (RF DECK) - Installation of plywood web joist, plywood decking and masonry wall parapet wood nailer. Duration: 2 days; 4 Resources. Predecessors: TBD 11 Roof Finish (RF FIN) - Installation of rigid insulation and membrane roofing. Duration: 2 days; 4 Resources. Predecessors: TBD 12 Exterior Doors & Windows (EXT DR&WNDW) - Installation of exterior doors and exterior windows. Duration: 2 days; 4 Resources, Predecessors: TBD 13 Building Enclosure (BLDG ENCL) - Building is weather tight. Milestone: 0 days; No Resources. Predecessors: 29 14 Floor Slab (FLR SOG) - Work includes fine grading, sand base, vapor barrier, concrete placement and finishing. Duration: 3 days; 4 Resources. Predecessors: TBD 15 Metal Stud (MTL STD) - Installation of the interior metal stud partition and celling framing. Duration: 1 day; 3 Resources. Predecessors: TBD 16 Partition (PART) - Installation of drywall partitions and ceilings includes finishing. Duration: 3 days; 4 Resources. Predecessors: TBD 17 Floor Finish (FLR FIN) - Installation of vinyl tile and cove base in front area and toilet room with concrete sealer elsewhere. Duration: 2 days; 3 Resources. Predecessors: TBD 18 Rough Carpentry (R/CARP) - Installation of doorframes in metal stud drywall partitions and partition wood blocking. Duration: 1 day; 2 Resources. Predecessors: TBD 19 Finish Carpentry (F/CARP) - Installation of door trim, doors, and window trim. Duration: 3 days; 3 Resources. Predecessors: TBD 20 Ceiling Grid (CLG GRID) - Installation of ceiling grid in front area. Duration: 1 day; 2 Resources. Predecessors: TBD 21 Ceiling Tiles (CLG TILE) - Installation of acoustic ceiling tiles. Duration: 1 day; 2 Resources. Predecessors: TBD 22 Paint (PAINT) - Painting of interior partitions, interior masonry walls and doorframes. Duration: 3 days; 3 Resources. Predecessors: TBD 23 Rough Plumbing (R/PLBG) - Installation of all rough plumbing above floor slab, vents and water meter. Duration: 3 days; 3 Resources. Predecessors: TBD 24 Finish Plumbing (F/PLBG) - Installation of plumbing fixtures (sinks and water closet). Duration: 2 days; 3 Resources. Predecessors: TBD 25 Rough Mechanical (R/MECH) - Installation of AC unit, furnace unit and ductwork. Duration: 1 day; 3 Resources. Predecessors: TBD 26 Finish Mechanical (F/MECH) - Installation of grilles, registers and diffusers as well as temperature control system. Duration: 2 days; 2 Resources. Predecessors: TBD 27 Rough Electrical (R/ELEC) - Installation of conduit, service inlet and meter box. Duration: 3 days; 3 Resources. Predecessors: TBD 28 Finish Electrical (F/ELEC) - Installation of light fixtures, receptacles and switches as well as pulling the wire for the connections. Duration: 3 days; 3 Resources. Predecessors: TBD 29 Weather Contingency (WTHR CONT) - Weather contingency of two days just before Building Enclosure. Duration: 2 days; No Resources. Predecessors: TBD 30 Punch List (PUNCH LIST) - Completion of punch list items, just before Project Completion. Duration: 1 day; 2 Resources. Predecessors: TBD 31 Project Completion (PROJ COMP) - Completion of project and turnover to Owner. Milestone: 0 days; No Resources, Predecessors: 30
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock