Question: (Maximal Flow Problem) A new oil well has been constructed at node A. The company wants to transport oil from the well at A to

(Maximal Flow Problem) A new oil well has been

(Maximal Flow Problem) A new oil well has been constructed at node A. The company wants to transport oil from the well at A to the refinery at node E. Each pipeline is labeled with its maximum flow rate in million cubic feet. The objective is to maximize the flow from A to E. 15 B 20 12 () 2 E 8 8 20 What is the maximal flow? 26 29 18 20