Question: MAY YOU PLEASE ASSIST WITH ONLY QUESTION 3.4 P11601 Studyguid. 4 / 5 33 The following table details the tasks required for Protea Creative to

MAY YOU PLEASE ASSIST WITH ONLY QUESTION 3.4

MAY YOU PLEASE ASSIST WITH ONLY QUESTION 3.4

P11601 Studyguid. 4 / 5 33 The following table details the tasks required for Protea Creative to manufacture a portable industrial vacuum cleaner. The task times as well as the precedence relationships are shown in the table below. The demand for the portable vacuum cleaner is 24 units per 8-hour shift: TURN OVER] 4 Task A B 0 DI E F G H 1 Immediate B A A,B D.E G F,G, HI Predecessor Task Time 13 7 14 8 12 14 6 7 8 6 (minutes) 3.3.1 Draw the precedence diagram. (4) 3.3.2 Calculate the cycle time. (2) 3.3.3 Determine the minimum number of workstations required. (2) 3.3.4 Assign tasks to workstations Show the cumulative station times as well as the unassigned station times

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!