Question: me structure this according to this commentary: . analysing the data you collected, what is your analysis and what is the data telling you about
me structure this according to this commentary: ." analysing the data you collected, what is your analysis and what is the data telling you about the problem, the data analysis should lead to a solution, hence don't be generic, use a specific project and run with it eg: what does the population data tell you? Does it have an impact? What does the geotechnical report tell you about the area, what does the rainfall data tell you, with that information you can make concept conceptualisation, justified assumptions, limitations and evaluation of results".
1.3-Describe how.you- I-developed conceptual-layouts of pump-driven-water distribution- Period-No: -4,50 performed or contributed-in- systems, considering-topographic-constraints, demand-zones, and. analysing engineering service reliability requirements.-To ensure-uninterrupted-water- problems, -using supply, I-incorporated duty pump systems, allowing-for- conceptualisation, justified- operational continuity in the event of pump-failure. I applied. assumptions, limitations and hydraulic-calculations such as-the-Darcy-Weisbach equation-to- evaluation of results. analyse pressure-losses-in proposed pipe networks. ] I-used the Red-Book (Guidelines for Human-Settlement Planning)- and.SANS-10252-1-to assess-design-criteria, -water-demand standards, and minimum pressure requirements." I evaluated -historical rainfall -data gathered from the South Africa- Weather-Services-to-inform sustainable-sizing of storage and pipe. capacities-in-Rainwater Harvesting -Project. I-integrated-design- standards, field-data, and regulatory frameworks-to support problem-definition-and future-design-validation-I-developed. comprehensive-tender specifications-in accordance with-GCC. standards-and created-structural-details-for-concrete-tank stands. 1 CONTROLLED-DISCLOSURET When-downloaded-for the ECSA-Document-Management-System, this document is-uncontrolled-and the responsibility-rests with the user-to ensure that it is in line with the authorised version on the-ECSA-Document Management System. .-11 QM-TEM-001-Rev-2---ECSA-Policy/Procedure- 27-11-20171 Form-No.: 1 Revision-No.:-4x Effective Date:1 APP-REG-FORM-B10 14/03/2025# Subject:-REGISTRATION-AS.A-PROFESSIONAL-ENGINEERING. ECSA TECHNOLOGIST# T Compiled-by:-1 Approved by:-1 Next-Review-Date:1 Manager-# Executive-RSIRx 14/03/2029# Page-27-of-57xx I-conducted-a-thorough evaluation of hydrogeological-data, which- was-instrumental in identifying potential subterranean water sources-for-borehole-construction. -This-data-further -guided-the- decision-making process regarding the continuation of drilling- activities-in areas where water-was not-initially-detected. I The issue of ground-water seepage I-investigated the source of the- water as it-was-unclear-in-the beginning: possible assumptions of- this issue-were the constant leaking of illegal pipeline-connections- and the-stream that used to run across the now-built-up residential- area.0Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
