Question: Medro was studying his Operations Management notes from GUST. The OM professor used to speak very fast, so, Medro was not sure if he had





Medro was studying his Operations Management notes from GUST. The OM professor used to speak very fast, so, Medro was not sure if he had heard the professor correctly when he wrote the following statement: "In the project network diagram, all the nodes connected to the (Finish node) must have a (Latest Finishing) time = (Project Completion ) (5 (5) ".time a. What Medro wrote is correct b. What Medro wrote is not correct Medro was also not sure if he had heard the professor correctly when he wrote the :following statement In the project network diagram, all the" nodes connected to the (Start node) must have (5) "a (Latest Starting) time =0 a. What Medro wrote is correct b. What Medro wrote is not correct Medro and Mariana carried out a CPM method for one of their projects. They summarized the results in the table below. The numbers are in days. Based on this table, what is the minimum time required (5) ? to to complete the project a. 10 days b. 15 days c. 25 days d. 35 days Medro told Mariana: "the first thing to do to carry out the south east Asia trip is to draw the Work-Break-Down structure for this project and then apply the CPM technique on the Work-Break-Down (5) ". ".structure a. Medro knows what he is talking about b. Medro does not know what he is talking about Mariana told Medro: "as we carry out the south east Asia project, we need to pay attention to the quality of each activity, how much we are spending on each activity, and how long it is taking us to carry out each activity. Oh, and also, teamwork is very very (5) ."important a. What Mariana said makes sense b. What Mariana said does not make sense Mariana told Medro that in phase 3 of the south east Asia project (the planning phase), we will need to decide on which activities will be critical and must be prepared for extra extra well. We also need to know which activities have slack time and how long is this slack time." (5) a. Mariana is thinking correctly b. Mariana is too serious, they don't need to do what she said Medro told Mariana: "the length of the longest path in the project network will tell us the minimum time to complete the project". Mariana said: "Medro don't you remember anything from GUST, the minimum time to complete the project is determined by the (5) ".length of the shortest path a. Medro is correct b. Mariana is correct
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
