Question: Melter Washer 40 50 Direct Material Direct Labour Hours worked Direct Labour Wage 30 60 20 80 55 Actual Liters of paint Pounds of Copper

Melter Washer 40 50 Direct Material Direct Labour Hours worked Direct Labour Wage 30 60 20 80 55 Actual Liters of paint Pounds of Copper Inspections 60 20 MOH 20 40 40 20 30 40 30 Estimated Liters of paint Pounds of Copper Inspections 25 45 35 MOH 20 40 35 45 40 Assuming the traditional method is used and inspections are the CD: What is the total estimated CD Select one: a. 110 b. 80 c. 215 d. 105 e. O f. None of the above g. 55