Question: Melter Washer 40 50 Direct Material Direct Labour Hours worked Direct Labour Wage 30 60 20 80 MOH Actual Liters of paint Pounds of Copper
Melter Washer 40 50 Direct Material Direct Labour Hours worked Direct Labour Wage 30 60 20 80 MOH Actual Liters of paint Pounds of Copper Inspections 60 20 20 55 20 30 40 40 40 Estimated Liters of paint Pounds of Copper Inspections 25 MOH 20 30 35 40 45 35 45 40 Assuming the traditional method is used and inspections are the CD: How much overhead is applied to the Washer Select one: a. 64.29 b. None of the above OO C. 50 d. 87.5 e. O f. 37.5