Question: Minnesota State University Project Activity Description Predecessor(s) Optimistic Likely Pessimistic Cost/Day A Bonding, insurance, tax structuring 21 24 45 $1,500 B Foundation, concrete footings for
Minnesota State University Project Activity Description Predecessor(s) Optimistic Likely Pessimistic Cost/Day A Bonding, insurance, tax structuring 21 24 45 $1,500 B Foundation, concrete footings for boxes A 20 60 70 $3,500 C Upgrading skybox stadium seating A 50 60 100 $4,000 D Upgrading walkways, stairwells, elevators C 36 50 100 $1,900 E Interior wiring, lathes B 35 40 45 $9,500 F Inspection approvals E 1 1.5 2 0 G Plumbing D, F 22 26 36 $2,500 H Painting G 15 25 35 $2,000 I Hardware/AC/metal workings H 20 25 60 $2,000 J Tile/carpet/windows H 8 10 12 $6,000 K Inspection J 0.5 1 1.5 0 L Final detail work/cleanup I, K 20 25 60 $4,500 Discussion Questions 1. Develop a network drawing for Towns Construction and determine the critical path. How long is the project expected to take? 2. What is the probability of finishing in 270 days
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts