Question: MOST Assignment Determine the normal time in seconds for the following activities: 1 - A machinist standing in front of his milling machine, grasps the
MOST Assignment
Determine the normal time in seconds for the following activities:
A machinist standing in front of his milling machine, grasps the waist level feed lever on
the machine, and rotates the lever one crank to engage the feed. The process time to
mill the part is There is no alignment and no action by the worker at the end of
the process time.
The worker obtain a nut from a part bin located within reach, place it on a bolt and run it
down with seven finger action
An administrative assistant presses a button within reach to activate the shrink wrap
machine. The machine runs for ten seconds.
Using the foot pedal to activate the machine, a sewing machine operator makes a stich
requiring seconds processing time. the operator must reach to the pedal with foot
Worker grasps a hammer from within reach and strike a block and put hammer a side.
An operator obtains a inch fixedend wrench within reach and fastens a bolt using
arm strokes, then lays the wrench aside.
A carpenter grasps a carpenter's square from steps away, returns and measures the
profile of one corner of a crate. He then asides the square within reach.
Obtain a wrench, interlocked with other tools, within reach at the machine and loosen a
nut with wriststrokes and aside the wrench to a bench steps away.
An operator gets a cloth from his pocket and wipes the surface of a metal sheet
ft and returns it to his pocket.
A supervisor picks up a pen on the desk, sits down in a chair making adjustments to
position the chair and signs her name on a check, then lays the pen inch away.
Step by Step Solution
There are 3 Steps involved in it