Question: Multiple - Concept Example 4 presents one method for modeling this type of problem. Civil engineers use a transit theodolite when surveying. A modern version

Multiple-Concept Example 4 presents one method for modeling this type of problem. Civil engineers use a transit theodolite when surveying. A modern version of this device determines the distance by measuring the time required for an ultrasonic pulse to reach a target, reflect from it, and return. Effectively, such a theodolite is calibrated properly when it is programmed with the speed of sound appropriate for the ambient air temperature. (a) Suppose the roundtrip time for the pulse is 0.341 s on a day when the air temperature is 293 K , the temperature for which the instrument is calibrated. How far is the target from the theodolite? (b) Assume that air behaves as an ideal gas. If the air temperature were 303 K , rather than the calibration temperature of 293 K , what percentage error would there be in the distance measured by the theodolite? Give your answer as a number between zero and one hundred with no units.
(a) Number Units
(b) Number Units
Multiple - Concept Example 4 presents one method

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!