Question: need answer in one hour maximum. Answer should be neat and clean and without plagrisim for upvote 3. Provide an alternate price to replace the


need answer in one hour maximum. Answer should be neat and clean and without plagrisim for upvote
3. Provide an alternate price to replace the built-up roof estimated in Figure 18-2 with a single-ply EPDM product. Project: The Training Center Contractor: Western Construction Company Proposal Date: April 28, 2003 Labor $1,042 Material $6,442 Estima Detal ANN Total $7,484 $20,000 $36.070 $45,667 $12,838 OM CSI Division Description 2 Structural excavation Sidewalks Foundations and rebar Slab-on-grade Elevated composite slab Form and pour tilt-ups Erect tilt-up panels Structural steel erection Rough carpentry Door Installation $13,445 $22,625 $14,445 $31,222 $6,248 $6,590 $55,245 $59,967 $115,212 Detai Detai Detai Detal 2 3 3 3 3 3 5 6 8 $50,000 $50,000 $17,800 $4,000 an OM OM OM Detal $2,500 $1,500 FIGURE 18-2 Direct work estimate. 2: 2 3. Provide an alternate price to replace the built-up roof estimated in Figure 18-2 with a single-ply EPDM product. Project: The Training Center Contractor: Western Construction Company Proposal Date: April 28, 2003 Labor $1,042 Material $6,442 Estima Detal ANN Total $7,484 $20,000 $36.070 $45,667 $12,838 OM CSI Division Description 2 Structural excavation Sidewalks Foundations and rebar Slab-on-grade Elevated composite slab Form and pour tilt-ups Erect tilt-up panels Structural steel erection Rough carpentry Door Installation $13,445 $22,625 $14,445 $31,222 $6,248 $6,590 $55,245 $59,967 $115,212 Detai Detai Detai Detal 2 3 3 3 3 3 5 6 8 $50,000 $50,000 $17,800 $4,000 an OM OM OM Detal $2,500 $1,500 FIGURE 18-2 Direct work estimate. 2: 2
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
