Question: need help on this question please a) Figure Q3(a) shows the footing layout plan, footing and stump details. Carry out taking off quantities for the

need help on this question please

need help on this question please a) Figure Q3(a) shows the footing

a) Figure Q3(a) shows the footing layout plan, footing and stump details. Carry out taking off quantities for the footing and stumped FI/CI and F3/C3 if the ground floor level is 3.45 m and top of footing level is 1.5 m.

(20 marks)

Notes: R6 - 0.222 kg/m

TIO - 0.616 kg/m

T12 - 0.888 kg/m

Assuming cover = 25 mm for footing and stump

You can make all the necessary and reasonable assumptions where applicable

b) Further, prepare the bill of quantity for this foundation FI/CI and F3/C3 if the rate for this project is as below

Excavation RM 23.30/m3

Filling RM 1.45/m3

Lean concrete RM 50.0/m2

Concrete RM 182.00/m3

Reinforcement RM 3.20/kg (all diameter mild steel)

Formwork RM 17.50/m2

NIVOTTORIO MARCA CONFIDENTIAL r/ca OF COLUMN PORT 14/02 FWC2 SO ISO DRUGE Tud ZER GROUND ROORLEVR F/ca UIT /s E/ F/ TOPOF FOOT ant TRENGER SONRA LORTFOLIO DROWTIME -LISEL ONE SEGRE TRE PLAN SECTIONALA /cs Faye COLUMHW ya C1 C2 FLOOR 0 FI/C! Poor FF WHERE TES 417 113 125 128 1722 B D 0 0 C - H-175 + 2000 12 RE-173 775 1150 -135 190 DC SRE Figure Q3(a): Footing layout plan PAO FOOTC NO FOTOMOS RDCORCEMENT OM DVD TES Ft 790 ITID T10-200 T10-200 To-20 10-200 12 ke 250 mo 1200 230 TID-200 T10-200 F4 13.00 300 TID-178 T10-17 TID FOOTING REINFORCEMENT SCHEDULE Figure Q3(a): Footing and stump detail

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Databases Questions!