Question: need help with all parts, last one is up or down Flexible Budget for various levels of Production . Budgeted amounts for the year 2

Flexible Budget for various levels of Production . Budgeted amounts for the year 2 leather strips $7.00 Labor 1.5 h $18.00 VOH 1.5 hr. 51.20 FOH $6,800 Required 1. Prepare a flexible budget for 3,500 4,000, and 4,500 units. Flexible Budget Variable Cost per Unit 3,500 units 4,000 units Direct material 4,500 units $ Direct labor Variable overhead Fixed overhead Total 2. CONCEPTUAL CONNECTION Calculate the unit costat 3,500, 4,000, and 4,500 units. (Note Round it costs to the nearest cent) Unit cost at 3,500 units II Unit cost at 4,000 units VOH 1.5hr. 3.20 FOH 56,500 Required: 1. Prepares flexible budget for 3.500,000, and 4,500 units Flexible Budget Variable Cost per Unit 3,500 units 4,000 units Direct me Direct linbor Variabletoverend 1,500 units Toe overhead 2. CONCEPTUAL CONNECTION Calculate the unit cost at 3.500, 4000, and 4.500 units, tete: Round unit costs to the nearest cont.) ut cost at 3.500 units Unit cost 4,000 units Unut costat 4,500 hits What happens to unit cost as the number of units produced increases? The cost per unit is the number of units produced increases because we cost is spread over a greater number of units
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
