Question: need to check answer on 9 and 10 9. Which PTS method requires the longest time to analyze a job? a. MTM-1 b. MTM-2 c.
need to check answer on 9 and 10
9. Which PTS method requires the longest time to analyze a job? a. MTM-1 b. MTM-2 c. MTM-3 d. BasicMOST 10. There were complete simultaneous motions occurred by both hands during an assembly job. What is appropriate method level in MOST