Question: New Optimistic Time = original optimistic time time saved by the SPTs = 3 Most likely time = 8 min Pessimistic time = original pessimistic

New Optimistic Time = original optimistic time time saved by the SPTs =3
Most likely time =8 min
Pessimistic time = original pessimistic time + time saved by the SPTs =13
Mean ORTOT reduction =5 min