Question: New Optimistic Time = original optimistic time time saved by the SPTs = 3 Most likely time = 8 min Pessimistic time = original pessimistic
New Optimistic Time original optimistic time time saved by the SPTs
Most likely time min
Pessimistic time original pessimistic time time saved by the SPTs
Mean ORTOT reduction min
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
