Question: Nine observations from a work measurement study using continuous timing are shown below. Allowances are determined as: personal, five percent; fatigue, five percent; delay, five
Nine observations from a work measurement study using continuous timing are shown below. Allowances are determined as: personal, five percent; fatigue, five percent; delay, five percent. Use the Work Measurement Excel template to determine the standard time for this operation.
WorkObservationElement123456789Performance RatingA0.090.130.060.050.100.090.140.130.1490%B0.250.190.210.210.260.240.260.280.2895%C0.470.500.470.450.470.470.500.470.51100%D0.620.670.640.610.720.700.700.670.72105%E0.700.740.740.690.820.830.780.790.81110%F1.031.050.981.001.111.121.051.071.0990%Round your answer to two decimal places.
Step by Step Solution
There are 3 Steps involved in it