Question: Nine observations from a work measurement study using continuous timing are shown below. Allowances are determined as: personal, five percent; fatigue, five percent; delay, seven
Nine observations from a work measurement study using continuous timing are shown below. Allowances are determined as: personal, five percent; fatigue, five percent; delay, seven percent. Use the Work Measurement Excel template to determine the standard time for this operation.
pter 08 Homework: Facility and Work Design (i) Nine observations from a work measurement study using continuous timing are shown below. Allowances are determined as: personal, five percent fatigue, five percent; delay, seven percent. Use the Work Measurement Excel template to determine the standard time for this operation. Round your answer to two aecma paces. minutes