Question: Note: n = 1 1 1 - At a construction site ( 5 0 + 0 . 1 n ) tons of cement, 1 7
Note: n
At a construction site tons of cement, tons of sand, tons of gravel are available.
As the site manager you know that you have to produce a total of of concrete.
In the laboratory the moisture content of sand and gravel was determined as and respectively.
And the absorption capacities are for both materials.
SSD bulk specific gravities are and for gravel and sand, respectively.
Specific gravity of cement is
It is required to produce concrete with the following proportions;
Cement: SandSSD: GravelSSD: and
Calculate the maximum volume of concrete that can be produced with the available materials at the field?
NOTE: is the last two digits of student's number. ie Student's number:
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
