Q1. The list of activities and their duration in days are provided in the table below. Construct the network diagram by using Precedence Diagraming Method and evaluate the value of each path and node with respect to float. Activity Predecessor Activity Duration in Days A Start 7 B Start 5 AB 9 D B 9 E C D 3 F 2 G EF 2Step by Step Solution