Question: o Consider the following Wind project Turbine Size = 1.5 MW Wind Speed = 6.5 m/s Unit generated = 3262500kWh per yr Price of
o Consider the following Wind project Turbine Size = 1.5 MW Wind Speed = 6.5 m/s Unit generated = 3262500kWh per yr Price of electricity= Tsh 0.16 per kWh Electrical generated = Tsh 522,800 per yr Operation cost = Tsh. 15,673 Installed cost = Tsh. 1,600,000 Calculate the pay back time I Arial Nar - 21 BIU A
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Payback Time Calculation for the Wind Project Given Turbi... View full answer
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
