Question: o Consider the following Wind project Turbine Size = 1.5 MW Wind Speed = 6.5 m/s Unit generated = 3262500kWh per yr Price of

o Consider the following Wind project  Turbine Size = 1.5 MW  Wind Speed = 6.5 m/s  Unit generated =

o Consider the following Wind project Turbine Size = 1.5 MW Wind Speed = 6.5 m/s Unit generated = 3262500kWh per yr Price of electricity= Tsh 0.16 per kWh Electrical generated = Tsh 522,800 per yr Operation cost = Tsh. 15,673 Installed cost = Tsh. 1,600,000 Calculate the pay back time I Arial Nar - 21 BIU A