Question: Old MathJax webview Old MathJax webview resource leveling suppose values Optimistic, Most Likely, and Pessimistic duration of each of the activities I needed gantt chart
Old MathJax webview


resource leveling
suppose values Optimistic, Most Likely, and Pessimistic duration of each of the activities

I needed gantt chart on the program ms project
K1 D F. A E H G K Duration Whether in critical ES EF LF LS slack 1 activity 2 A 0 0 0 0 0 O yes 8 yes 0 8 8 0 0 a un AwN 0.1 no 8 8.1 10.5 2.4 10.4 8 1 no 9 13 12 4 D 8 1 no 9 11 10 2 E 9 10 14 13 4 7 F 1 no 2 no 8 10 11 9 1 8 G 8 3 no 11 14 3 11 9 H 10 1 no 11 12 1 11 101 8 12 12 8 0 B Description Immediate Predecessors Start Design A Order special accessories B Build frame B Build doors B Attach axles, wheels, gas tank D Build body shell B Build transmission and drivetrain B Fit doors to body shell GE Build engine B Bench-test engine Assemble chassis F,H,K Road-test chassis L Paint body Install wiring N Install interior N Accept delivery of special accessories Mount body and accessories and chassis M,O,P,Q Road test car R Attach exterior trim S Finish T 11 G 12 K 12 14 14 12 0 4 yes 2 yes 1 yes 0.5 yes 14 15 15 14 0 13 L 15.5 15 15.5 0 15 14 M 11 13 14 12 1 15 N 13 14 15.5 14.5 1.5 16 O 2 no 1 no 1.5 no 5 no 14.5 13 15.5 1 14 17 P 13.1 8.1 2.4 10.5 15.5 16.5 18 16.5 15.5 15.5 0 19 R 1 yes 0.5 yes 16.5 0 17 17 16.5 20 S 18 17 18 17 0 1 yes 21 T 18 18 18 18 0 O yes 22 U 23Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts