Question: On the table below, summarizing the 10 observations made by an analyst, determine the normal time, and the standard time for the operation. Elements Average
- On the table below, summarizing the 10 observations made by an analyst, determine the normal time, and the standard time for the operation.
| Elements | Average Selected Time in minutes (from the 10 observations) | Rating Factor |
| Get drawing and ring clock | 2.0 | 1.23 |
| Remove hob | 1.0 | 1.18 |
| Remove arbor | 1.0 | 1.15 |
| Obtain hob and arbor | 3.0 | 1.25 |
| Place hob | 3.0 | 1.20 |
| Set angle | 1.0 | 1.15 |
| Place arbor | 2.0 | 1.20 |
| Indicate arbor | 2.0 | 1.26 |
| Change index gears | 3.0 | 1.18 |
| Change speed gears | 1.0 | 1.18 |
| Change feed gears | 3.0 | 1.18 |
| Check all gearing | 2.0 | 1.23 |
| Measure piece for size and set for depth | 2.0 | 1.10 |
| Check index and size | 7.0 | 1.20 |
| Set stops | 1.0 | 1.20 |
| Personal Allowance = 5% | ||
| Fatigue Allowance = 4% | ||
Required:
- Compute for the Normal Time
- Compute for the Total Allowance (Personal, Fatigue and Delay)
- Compute for the Standard Time Per Unit