Question: 6. On the table below, summarizing the 10 observations made by an analyst, determine the normal time, and the standard time for the operation. 10

6. On the table below, summarizing the 10
6. On the table below, summarizing the 10 observations made by an analyst, determine the normal time, and the standard time for the operation. 10 1.0 Elements Get drawing and ring clock Remove hob Remove arbor Obtain hob and arbor Place hob Set angle Place arbor Indicate arbor Change index gears Change speed gears Change feed gears Check all gearing Measure piece for size and set for Selected Time in minutes Rating Factor 2.0 1.23 1.0 1.18 1.15 3.0 1.25 1.20 1.15 2.0 1.20 2.0 1.26 3.0 1.18 1.0 3.0 1.23 2.0 1.10 1.18 1.18 2.0 depth 1.20 Check index and size 7.0 Set stops 1.0 1.20 Personal Allowance = 5% Fatigue Allowance = 4% Required: a. Compute for the Normal Time b. Compute for the Total Allowance (Personal, Fatigue and Delay) c. Compute for the Standard Time Per Unit

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!