Question: Only do the load calculations for 3:00 pm. Problem two: Please manually calculate the total cooling load, sensible cooling load, latent cooling load of the
Only do the load calculations for 3:00 pm.
Problem two: Please manually calculate the total cooling load, sensible cooling load, latent cooling load of the single office described in the Figure below if this office is located in St. Louis, MO at 3:00pm. Please provide results for the following outdoor design condition: DB =95F, Daily range =18F. Assume top floor. 42 IN Adjacent Room Windows: 3' X 6, Double pane, alum frame, light blinds Walls: 10' high, 4" face brick, 2" extruded polystyrene, 8" L.W. block Roof: Metal pitched roof with R-25 on 1" acoustic tile ceiling (vented) Floor: slab on grade with 24" R-5 vertical insulation 15 people doing moderate office work Twenty 2-bulb 48" T-8 flourescent bulb light fixtures 15 computers with 17 inch monitors and 4 small office laser printers R-4 supply duetwork located in attic above ceiling insulation No return duct 24' Interior Hallway Problem two: Please manually calculate the total cooling load, sensible cooling load, latent cooling load of the single office described in the Figure below if this office is located in St. Louis, MO at 3:00pm. Please provide results for the following outdoor design condition: DB =95F, Daily range =18F. Assume top floor. 42 IN Adjacent Room Windows: 3' X 6, Double pane, alum frame, light blinds Walls: 10' high, 4" face brick, 2" extruded polystyrene, 8" L.W. block Roof: Metal pitched roof with R-25 on 1" acoustic tile ceiling (vented) Floor: slab on grade with 24" R-5 vertical insulation 15 people doing moderate office work Twenty 2-bulb 48" T-8 flourescent bulb light fixtures 15 computers with 17 inch monitors and 4 small office laser printers R-4 supply duetwork located in attic above ceiling insulation No return duct 24' Interior Hallway
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts