Question: only solve problem 3 Problem 3-(Reference Problem 1)- Using the OC curve data from Problem 1, establish and draw the (AO) Average Outgoing Quality curve

only solve problem 3 Problem 3-(Reference Problem
only solve problem 3 Problem 3-(Reference Problem
only solve problem 3
Problem 3-(Reference Problem 1)- Using the OC curve data from Problem 1, establish and draw the (AO) Average Outgoing Quality curve for the inspection plan described in Problem 1 (use enough data points to show the curve accurately), Questions: 1. Estimate the AOQ for the Quality Limit (QL), established by the Producer, 2. Determine the AOQL (Average Outgoing Quality Limit) 3. Explain to a lay persona. the Purpose of the AOQ Curve, and b. The assumption for the values of the ADQ estimates. important note: Data used in the following problems is based on the charting of various functions, it is important that you carefully draw these functions in a portrait format in the provided graph paper) Problem 1: a Supplier of a rechargeable battery, used in the production of a child toy, contracts to provide the Toy Producer with batteries in lot quantities of N = 3000 units, where each lot subjected to the following Single sampling plan: n=80, C= 1. The supplier maintains an AQL (Acceptable Quality Level) Po=1%, rejected lots are returned to the Supplier for Remediation. The Producer considers lots of 4% non-conforming to be his QL (Quality Limit) Questions: Draw the OC (Operating Characteristics) Curve using 7 points in the required range of interest, and estimate the a and B type errors for this inspection plan

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!