Question: Operating system question. The table below is a set of processes: Assuming a uniprocessor and that all processes arrive at time 0: (a) Draw the
Operating system question.
The table below is a set of processes:
Assuming a uniprocessor and that all processes arrive at time 0:
(a) Draw the Gantt chart for a schedule that will minimize average turn-around time. (use SJF)
(b) Draw the Gantt chart for a schedule that will minimize average waiting time. (use SJF)
(c) Draw the Gantt chart for a schedule that will minimize the maximum tardiness and then, if possible, the average turn-around time. (use Smith's algorithm)
P2 P3 P4 P5 P6 P7 P8 10 12 6 1 8 4 5 Process P1 Processing 3 time Due Time 4 15 10 9 42 30 12 35Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
