Question: Organizational Process Optimization Problem: Maor is a jewelry store that received a special order to process 8 lots of precious stones for faceting. In order

Organizational Process Optimization Problem:
Maor is a jewelry store that received a special order to process 8 lots of precious stones for faceting. In order to perform the faceting, 2 machines were rented that perform the same cuts. The processing time for each batch of stones is shown in the following table:
StoneDaysrequiredtofacetthebatchDiamond4.2Sapphire3.87Ruby6.97Emerald5.31Amethyst3.94Zirconium6.89LapisLazuli3.32Tourmaline7.53
The machines are rented by the day (or fraction thereof) and must be returned together. They can only process one type of stone at a time, as they require specific calibration for each stone, which is a slow and variable process. For safety reasons, batches cannot be split. The first calibration always takes 5.2 hours, regardless of the type of stone.
The following table shows the number of hours required to change from one configuration to another:
\table[[,,New configuration],[,,Diamond,Sapphire,Ruby,Emerald,Amethyst,Zircon,Lapis Lazuli,Tourmaline],[\table[[Previous],[Configuration]],Diamond,,3.69,4.4,2.66,4.12,2.87,4.72,4.67],[Sapphire,3.99,,2.97,4.98,4.93,2.82,2.83,4.76],[Ruby,3.68,4.58,,2.78,2.8,4.46,3.12,5],[Emerald,4.75,4.47,2.47,,3.24,2.38,2.74,3.18],[Amethyst,2.31,2.16,2.91,3.92,,2.4,2.51,4.52],[Zircon,3.53,2.01,2,2.8,3.75,,4.3,4.92],[Lapis Lazuli,3.14,2.76,4.58,4.28,2.63,3.42,,4.27],[Tourmaline,4.32,4.45,4.63,3.35,4.44,4.37,2.69,]]
The following aspects must be considered:
*Diamond and sapphire batches require higher voltage, which can activate the circuit breaker, so they should not be the first to be processed.
*Lapis Lazuli and Tourmaline batches overheat the machine, so they should not be worked consecutively.
*The workload must be balanced between both.
*The objective is to assign tasks and order them so that they are completed as quickly as possible, minimizing the rental time of the machines.
Instructions: Design a model that minimizes the project costs. The model must be delivered with and without parameterization (in the procedure, define the variables, the objective function, the restrictions, the restrictions on the nature of the variables).
Hint: a decision variable can have several subscripts as needed, for example, X_ijk can represent the quantity of product i to be manufactured on day j to be delivered to customer k.
 Organizational Process Optimization Problem: Maor is a jewelry store that received

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!