Question: orthographic drawing package 1 ) context plan ( roof plan of proposal within the larger context of the campus; scale as appropriate 1 : 5

orthographic drawing package 1) context plan (roof plan of proposal within the larger context of the campus; scale as appropriate 1:500/1:1000/etc.; may be aerial photo or drawn)2) site/floor plan(s)(ground floor with immediate context; other floors if multiple levels; 1:50 scale)3) elevations (2 required south and one other; 1:50 scale; materials rendered)4) sections (2 required; 1:50 scale) design development process 1) sketch development (including built proposal and site/context)2) vignettes (2 required; localized sketches of the proposal's development) massing model The massing model will illustrate the design proposal including its immediate site context at a scale of 1:100. Create a schedule to complete your studio project based on the following process: 1. Establish the objective Successful completion of the Studio Project. 2. Identify the project activities Scope out everything that needs to be done to complete the project. Make sure you include all the deliverables as listed in the project handout Orthographic drawing package Design development process Massing model Project presentation This can start with the list of required items to be submitted but then needs to extend to all the secondary items that are needed to complete that item. 3. Determine the sequence of activities Put them in order especially if one item is dependent on another 4. Determine the duration of the activities Estimate the time (for many things you may not know best guess, then if you review the actual time taken you will have a better guess next time)5. Calculate the schedule Work out the time needed as this project is individual the total time expected becomes the Critical Path or the shortest time to complete the project. 6. Revise and adjust (for reference only) In group work this is where overlapping of tasks can be worked out to shorten the overall Critical Path using CPM. If activities can be completed by separate people at the same time, then they should be scheduled at the same time and not one after another. As this will have little impact on this assignment, we will skip this part 7. Monitor and control (for reference only) Although beyond the scope of this assignment if you over or under estimate the time make an adjustment to your schedule it may prove very useful to have some level of record for the next project deadline! The submission should be in the form of a chart or similar (an example is provided) and incorporate items 2 through 5 of the scheduling process, as listed and annotated above. BONUS: Prepare a reasonable* Gant chart of your Studio 1 project completion schedule and I will turn your lowest Introduction to APFM assignment

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!