Question: OSIDemo _ FD 1 1 1 . Total Current is a tag that measures the current draw of a pump, with a new value being

"OSIDemo_FD111.Total Current" is a tag that measures the current draw of a pump, with a new value being read and archived by the PI Data Archive every second. Imagine you configure this PI ProcessBook Data Set, and trend it over 8 hours. What is concerning about the configuration shown below?
Saved Data Sets
NEW DATA SET
Data Set Columns
Total
Average
Minimum
Maximum
PctGood
Range
5tdDev
pstdDev
Count
Preview
11212020 AM
11212020 AM
11212020 AM
x
280.814
280.814
280.814
PI Calculation Data
Data
PI Server
PERVI
PI Tag or Expression
Total current'
Settings
Name
AVERAGE CURRENT
Description
Calculation Interval
Value Column Name
Stepped Plot
Save
Tag Search..
, 'mon-Smo', '*I)
Interval Sync Time
Refresh Interval (min)
Total Conversion Factor
Cancel
This configuration will put an unnecessarily high load on the PI Data Archive and should be reworked
'mon-5mo' is not a valid PI Time, so this configuration will throw an error
The refresh internal (min) is incorrect if the trend will cover 8 hours, it should be set to "480"
The calculation interval is incorrect if the trend will cover 8 hours, it should be set to "8h"

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Databases Questions!