Question: PA 4-2 Consider a process consisting of... Consider a process consisting of three resources. Assume there exists unlimited demand for the product. Resource 1 has
PA 4-2 Consider a process consisting of...
Consider a process consisting of three resources. Assume there exists unlimited demand for the product.
- Resource 1 has a processing time of 6 minutes per unit.
- Resource 2 has a processing time of 3 minutes per unit.
- Resource 3 has a processing time of 5 minutes per unit.
Instruction: Round "cost of direct labor" and "target manpower" to 2 decimal places. Round 'average labor utilization" percent to 2 decimal places.